If you’re planning a kitchen remodel in Los Angeles, the right sequence—budget, design, permits, materials, and build—keeps your project on time and on budget.
JMS Advice: Start with scope + budget alignment to prevent change orders and delays later.
Clarify must-haves vs. nice-to-haves. Common upgrades: layout changes, cabinetry, countertops, lighting, appliances, flooring.
Set a realistic LA range (size & finishes drive cost).
Allocate 10–15% contingency.

Layout, electrical, or plumbing changes typically require permits. Confirm before demolition. JMS Developers Inc. coordinates plans and inspections.

We recommend durable materials (e.g., quartz counters, porcelain tile) and fixtures with solid warranties.

Typical sequence: demo → rough-in → inspections → drywall → cabinets → counters → tile → paint → punchlist.
Get a Free Consultation — we’ll help plan scope, budget, and timeline.
Small cosmetic updates may take 3–6 weeks; full gut + layout changes often take 8–14+ weeks depending on permits and scope.
Yes for most electrical, plumbing, structural, and layout changes. JMS can manage the permit process for you.
Budgets vary widely; materials and scope drive cost. We help you align selections to goals and timeline.
JMS DEVELOPERS, INC. is dedicated to providing premier customer service to homeowners. We offer a wide range designs to meet your project needs and ensure durable and cost effective workmanship.
NEWSLETTER
Sign up for our newsletter to receive updates, news, and insights.
Licensed • Insured • Bonded • CSLB # 1040625
Copyright 2025. JMS Developers, Inc.. All Rights Reserved.